Our yard is on Holt Boulevard in Ontario, and Diamond Bar is 15 miles west on the 60, off the Diamond Bar Boulevard and Grand Avenue exits. Permits go to the City of Diamond Bar Building and Safety Division. The city was incorporated in 1989, so the record for a slab poured before then sits with Los Angeles County, and we pull it when a job means touching a footing. Inside The Country Estates the association reviews the drawing as well, and we file with both before a date is set.
The ranch was graded in one program from the 1960s and the pads follow the contours, so a lot off Diamond Bar Boulevard or Golden Springs Drive is usually a flat house pad with a slope at the back and a driveway pitched down to the street. Those driveways are the job we see most. In the newer tracts off Grand Avenue the drives run longer and steeper, and a steep drive is broomed across the fall rather than along it, so a tire holds on a wet morning instead of sliding to the curb.
Water leaves Diamond Bar slowly. Clay drains poorly, and the slopes send roof and lawn runoff onto the flat pads, so every slab we pour here falls away from the house at a quarter inch per foot and a drain goes in wherever a slope meets a pad. The calendar runs later than in the flatland towns. The hills hold the winter wet into April, and from June to September we pour at first light, because a slab finished in the afternoon heat sets before it can be floated.