Foundation raising takes the weight of a standing building off the concrete beneath it and holds it in the air on steel and cribbing while that concrete is dealt with. Four situations bring people to it: a house settled out of level, a foundation that has failed under a house nobody wants to leave, a floor that has to come up above the grade around it, and a crawl space or a shop that has to gain working height. All four are one operation up to the point the building leaves the ground.
The license classes draw a line through this job, so the scope is worth stating plainly. A C-8 concrete license, the one Ontario Concrete Pro holds, forms, pours, places and finishes concrete. Raising, cribbing, underpinning and moving a structure are C-21, Building Moving and Demolition in the state's classifications. So Victor Salgado brings a licensed C-21 lifter in for the lift and builds what the house comes down onto, and the estimate says which work is whose.
Nothing here is ever exempt work. An engineer's report sets how far out of level the building is and where, his stamped detail sets what it comes to rest on, and a soils report sets what that support may bear on. The plan set and every inspection go to the Building Department, City of Ontario on East B Street, and CRC R109.1.1 keeps concrete out of the ground until an inspector has seen the excavation with forms up and steel supported. It is covered by liability insurance on every job.