Our yard is in Ontario, and Walnut is 16 miles west on the 60, off at Lemon Avenue, so a crew is here inside half an hour if it leaves before the freeway fills. Plans go to the City of Walnut building division, and because so many lots here are hillside, we draw a drainage detail on every wall plan before we go, since a wall in clay without one is not a wall we would build, and a plan that answers the question before it is asked is one trip to the counter rather than two.
The streets above Valley Boulevard and around Mt. San Antonio College were built through the 1970s and 1980s on graded terraces, so a lot is level for the house and drops at the back fence, sometimes by a full story. Driveways climb from the street, side yards are steps rather than paths, and the pool sits on the fill at the edge. On the flatter ground along Lemon Creek the lots are older and the work is more often a plain replacement drive.
Water decides the sequence. Clay drains slowly, so after a winter storm a Walnut yard is soft for days where a San Dimas gravel lot would be dry by morning, and we do not pour on it until a probe says it is firm. That puts hillside pours in the dry months where we can, and it puts a drain behind every wall and a fall on every slab away from the cut. Summers here pass 100 degrees, so from July to September pours start at 6 in the morning and cure under a cover.